Humphreys & Associates EVMS Workshop
Reference Materials
The following is a list of documents and other useful references related to the various workshops Humphreys & Associates (H&A) conducts. All items are available on the noted web site or on the H&A web site.
Revised: 11 April 2023
Office of Management and Budget (OMB)
OMB Circular A-11, Part 7, Planning, Budgeting, and Acquisition of Capital Assets, is frequently cited in reference to EVM requirements for federal agencies. The most current requirements can be found in the Supplement to Part 7 (Appendices), the Capital Programming Guide, Supplement to the Office of Management and Budget Circular A-11: Planning, Budgeting and Acquisition of Capital Assets, August 2022. The entire OMB Circular A-11 Preparation, Submission, and Execution of the Budget (August 2022), including Part 7, can be selected from the list of OMB circulars here: https://www.whitehouse.gov/omb/information-for-agencies/circulars/.
Federal Acquisition Regulation (FAR)
The home page for the FAR is https://www.acquisition.gov/far/. The FAR Parts specific to EVM are listed here. These regulations apply to all federal agencies.
-
FAR PART 34.2 – Earned Value Management System
-
FAR 52.234-2 – Notice of Earned Value Management System – Pre-Award IBR
-
FAR 52.234-3 – Notice of Earned Value Management System – Post Award IBR
- FAR 52.234-4 – Earned Value Management System (contract clause)
Government Accountability Office (GAO)
The GAO publications include:
-
GAO Agile Assessment Guide: Best Practices for Agile Adoption and Implementation, September 2020 edition (publication reference GAO-20-590G). Chapter 7 discusses earned value management best practices in an Agile environment.
The guide can be found here: https://www.gao.gov/products/gao-20-590g -
GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Program Costs, March 2020 edition (publication reference GAO-20-195G). Chapter 7 includes a discussion on work breakdown structures. Chapters 17 to 20 discuss earned value management systems.
The guide can be found here: https://www.gao.gov/products/gao-20-195g
- GAO Schedule Assessment Guide: Best Practices for Project Schedules, December 2015 (publication reference GAO-16-89G). https://www.gao.gov/products/gao-16-89g
EIA 748-D Standard for Earned Value Management Systems
This document is copyrighted and may not be reproduced without permission. It can be purchased from SAE International (https://www.sae.org/standards/content/eia748d/). Purchase a single copy for personal use ($85.00) or a site license.
Department of Defense (DOD)
For DOD related standards, instructions, and other acquisition related documents, these items are available on the http://www.everyspec.com web site. EVM related items include:
-
DOD Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs, January 2017
- MIL-STD-881F, Work Breakdown Structures for Defense Materiel Items, May 2022
Another useful reference for DoD are the Acuisition Guidebooks, an online resource that complements DoD directives and instructions. Acquisition Guides specific to program management include a Guide to DoD PM Business Processes. See https://aaf.dau.edu/guidebooks/.
Acquisition Data and Analytics (ADA), Integrated Program Management (IPM) Division
The Office of the Under Secretary of Defense (OUSD) for Acquisition & Sustainment (A&S), Acquisition Enablers (AE), Acquisition Data and Analytics (ADA), Integrated Program Management (IPM) Division is responsible for EVM Policy. See their website at https://www.acq.osd.mil/asda/ae/ada/ipm/index.html. The following content can be found on this website:
-
EVM Central Repository (EVM-CR) – Access the EVM-CR Portal, User Guides, tools, etc.
-
Integrated Program Management Data and Analysis Report (IPMDAR) – Implementation Guide, Data Item Description (DID), File Format Specifications (FFS) and Data Exchange Instructions (DEI).
-
Earned Value Management System Interpretation Guide (EVMSIG) – March 2019
-
Earned Value Management Implementation Guide (EVMIG) – January 2019
- Agile and EVM: A Program Manager’s Desk Guide – November 2020
The DOD must also comply with the Defense Federal Acquisition Regulation Supplement (DFARS) (http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html). DFARS Subparts specific to EVM include:
-
DFARS Subpart 234.2 – Earned Value Management System (policy, solicitation provisions, and contract clause)
-
DFARS Subpart 242.70 – Contractor Business Systems
- Subpart 242.7000, Contractor Business System Deficiencies
-
Subpart 242.7001, Contract Clause
-
DFARS Subpart 252 – Solicitation Provisions and Contract Clauses
- Subpart 252.234-7001, Notice of Earned Value Management System
- Subpart 252.234-7002, Earned Value Management System (contract clause)
- Subpart 252.234-7003 Notice of Cost and Software Data Reporting System (CSDR)
- Subpart 252.234-7004,Cost and Software Data Reporting System (contract clause)
Cost Assessment and Program Evaluation (CAPE)
The Cost Assessment Data Enterprise (CADE) initiative is managed within the Office of the Secretary of Defense (OSD) for Cost Assessment and Program Evaluation (CAPE). The CADE website https://cade.osd.mil/ is a useful resource for Cost and Software Data Reporting (CSDR) policy, latest edition of the DoDM 5000.04 CSDR Manual, and related Data Item Descriptions (DIDs). It also provides a link to the CADE Portal for delivery of CSDR reports.
Defense Contract Management Agency (DCMA)
The DCMA Earned Value Management System Center web site (https://www.dcma.mil/HQ/EVMS/) provides a list of their current Business Practices (BPs) that discusses how they approach EVMS compliance and surveillance reviews. The current list of BP’s include:
-
BP0 – Earned Value Management Systems (overarching guidance document)
-
BP1 – EVMS Pre-Award Support
-
BP2 – EVM System Description Review. This BP includes the EVMS Cross Reference Checklist (CRC) as an attachment.
-
BP3 – EVMS General Support
-
BP4 – EVMS Surveillance
-
BP5 – EVMS Review for Cause
- BP6 – EVMS Compliance Review
The current revision of the DCMA EVMS Compliance Metrics (DECM) Templates can also be downloaded from this web site.
Data Item Descriptions (DID)
The following is a list of the current EVM related Department of Defense (DoD) DIDs and related forms. These items are available on the http://www.everyspec.com web site and/or the ASSIST database (http://quicksearch.dla.mil/).
- DI-MGMT-81861A – Integrated Program Management Report (IPMR), September 2015. Note: DI-MGMT-81861 – Integrated Program Management Report (IPMR), June 2012 supersedes the DI-MGMT-81466A (CPR) and DI-MGMT-81650 (IMS) DIDs.
-
DI-MGMT-81861B – Integrated Program Management Data and Analysis Report (IPMDAR), March 12, 2020. Note: DI-MGMT-81861B supersedes the DI-MGMT-81861A (IPMR) DID.
-
DI-MGMT-81861C – Integrated Program Management Data and Analysis Report (IPMDAR), August 30, 2021. Note: DI-MGMT-81861C supersedes the DI-MGMT-81861B (IPMR) DID.
-
DI-MGMT-81468 – Contract Funds Status Report (CFSR), October 1995
- DI-MGMT-81334D – Contact Work Breakdown Structure (WBS), May 2011
Department of Energy (DOE)
The DOE Earned Value Management web site includes guides and policy documents (https://www.energy.gov/projectmanagement/earned-value-management). Note “G” indicates a Guide, “O” indicates an Order. Current documents include:
-
DOE G 413.3-10B, Integrated Project Management Using the Earned Value Management System, April 2022
-
DOE O 413.3B Change 6, Program and Project Management for the Acquisition of Capital Assets, January 2021
-
DOE G 413.3-20, Change Control Management Guide, October 2015
-
DOE DID Integrated Program Management Report (IPMR), October 2018
-
DOE Contractor Project Performance (CPP) Upload Requirements for Project Assessment and Reporting System (PARS), October 2018
-
DOE Earned Value Management Systems Compliance Review Standard Operating Procedure (ECRSOP), July 2022
-
DOE EVMS and Project Analysis Standard Operating Procedure (EPASOP), January 2020
- DOE Guide 413.3-24 Planning & Scheduling, April 2022
- DOE EVMS Gold Card, March 2019
Department of Health and Human Services (HHS)
The home page for the HHS is http://www.hhs.gov/. The HHS Parts specific to EVM are listed here. These regulations apply to all federal agencies.
-
HHS Part 334 – Major System Acquisition
- HHS Subpart 334.2 – Earned Value Management System
Department of Homeland Security (DHS)
The home page for the DHS is http://www.dhs.gov/. The DHS Parts specific to EVM are listed here. These regulations apply to all federal agencies.
-
DHS Acquisition Manual dated October 2009, updated January 2020
- DHS Subchapter 3034.2 – Earned Value Management System
National Aeronautics and Space Administration (NASA)
Topics related to EVM can be found at this web site: https://www.nasa.gov/evm. Note “NPD” indicates a NASA Policy Directive, “NPR” indicates a NASA Procedural Requirements document. Current documents available under the Regulations/Requirements topic include:
-
NASA EVM Contract Requirements Checklist
-
NPD 7120.4D – Engineering and Program/Project Management
-
NPR 7120.5F – NASA Space Flight Program and Project Management Requirements
-
NPR 7120.7 – NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements
- NPR 7120.8 – NASA Research and Technology Program and Project Management Requirements NASA FAR Supplements which include Part 1834: Major System Acquisition and Part 1852.234-1 Earned Value Management System (solicitation provision) and 1852.234-2 Earned Value Management System (contract clause).
This web site also includes a set of NASA EVM Handbooks:
-
Integrated Baseline Review (IBR) Handbook, January 2022
-
Schedule Management Handbook, January 2020
-
Work Breakdown Structure Handbook, November 2021
-
EVM Implementation Handbook, November 2021
- EVM P-CAM Reference Guide, November 2021
National Science Foundation (NSF)
The NSF has published a Research Infrastructure Guide (RIG) dated December 2021 (publication reference NSF 21-107) that addresses earned value management requirements for major facilities and mid-scale projects (see Section 4, Key Management Principles and Requirements for Major Facilities).
The guide can be found here: https://www.nsf.gov/publications/pub_summ.jsp?ods_key=nsf21107&org=CMMINDIA Integrated Program Management Division (IPMD)
The following documents are available on the NDIA IPMD web site Division Guides and Resources page (https://www.ndia.org/divisions/ipmd/division-guides-and-resources). Available documents include:
-
Earned Value Management Systems Intent Guide (EIA-748-D), August 2018
-
Earned Value Management System Acceptance Guide, Version 4, January 2023
-
Earned Value Management Systems Application Guide, Version 4, September 2022
-
Integrated Baseline Review Guide, Version 4, January 2023
-
Surveillance Guide, Version 4, October 2021
-
Planning and Scheduling Excellence Guide (PASEG), Version 5.0, September 2022
-
Guide to Managing Programs Using Predicitive Measures, Version 2, March 2021
-
Earned Value Management System Guideline Scalability Guide, Version 2, January 2020
-
Industry Practice Guide for Integrating Agile and EVM on Programs, Version 1.4, December 2022
-
NDIA IPMD Master Definitions List for Guides, April 2022
- Contracting with Earned Value Management Requirements, September 2022
Papers, Articles, and Apps
The following documents are listed on the H&A EVMS Education Center, Workshop Reference Materials web page and available at the links below.
-
Christensen and Heise, Cost Performance Index Stability, https://www.humphreys-assoc.com/evms/cost-performance-index-stability-ta-a-262.html
-
Christensen, The Costs and Benefits of the Earned Value Management Process https://www.humphreys-assoc.com/evms/costs-benefits-earned-value-management-process-ta-a-263.html
-
Christensen, Is the CPI-Based EAC a Lower Bound to the Final Cost of Post A-12 Contracts? https://www.humphreys-assoc.com/evms/based-lower-bound-final-cost-post-contracts-ta-a-264.html
-
Christensen, Is the Cumulative SPI-Based EAC an Upper Bound to the Final Cost of Post A-12 Defense Contracts? https://www.humphreys-assoc.com/evms/cumulative-based-upper-bound-final-cost-post-defense-contracts-ta-a-265.html
-
Fleming and Koppleman, Sarbanes-Oxley: Does Require Earned Value Management on Projects?
https://www.humphreys-assoc.com/uploads/commerce/images/pdf/FlemingKopplemanSarbanes-Oxley.pdf
-
For a simple EV calculator that will run on a desktop web browser, visit http://www.encore-analytics.com/evcalc.php To run the EV calculator on a smart phone, visit http://www.encore-analytics.com/evcalc_mobile.php
-
Undistributed Budget & Management Reserve: The Difference
https://www.humphreys-assoc.com/evms/difference-between-undistributed-budget-management-reserve-ta-a-59-t-1_15.html
-
The Effective Use of Management Reserve
https://www.humphreys-assoc.com/evms/effective-management-reserve-ta-a-60-t-1_15.html