Project Scheduling Workshop Agenda

Proudly Serving the EVM Community for 40 Years.
The Leader in Earned Value Management Consulting and Training

EVMS and Project Management Training
Project Scheduling Workshop Agenda

Introduction

  • Discussion of workshop approach
  • Workshop Learning Objectives/DLOs
  • Review of notebook contents

Introduction to Project Scheduling Workshop

  • Workshop Focus
  • Programs vs. Projects
  • Workshop Objectives
  • Class exercise

Project Schedule Use and Users

  • Why have a schedule?
  • impacts of poor scheduling
  • Using schedule results
  • Schedule Roles and Responsibilities

Schedule Development Process

  • Planning vs. Scheduling
  • Sources of scheduling information
  • Nine step schedule development process
  • Development Considerations and Concerns

Scope Definition and Work Breakdown Structure

  • Tradeoff: desired scope vs. available resource
  • WBS overview
  • Introduction to the program planning approach

Class Exercise – The Family Vacation (Part 1)

  • Practice scope decomposition

Network Diagramming Fundamentals

  • Introduction to the fundamental components of a schedule network:
    • Activities
    • Relationships

Case Studies – Creating Simple Networks and Network Construction

  • Practice creating network diagrams

Critical Path Fundamentals

  • Definition of critical path
  • Forward and Backward Passes
  • Total Float Free Float
  • How to determine the critical path
  • Critical path vs. driving path

Class Exercise – The Family Vacation (Parts 2 & 3)

  • Build on Part 1 by adding durations and logic to calculate the critical path

Case Study: Path Analysis Using Total Float

  • Using total float and trend data to determine areas for management attention

Project Schedule Modeling Techniques

  • Overview of common schedule modeling tools/techniques
    • Lags
    • Schedule Visibility Tasks
    • Leads
    • Constraints
    • Templates
    • Level of Effort

Case Study: Constructing a More Complex Network

  • Construction of a network diagram with more complex relationships

Case Study: Use of Constraints

  • Impact of Constraints on a schedule network

Resource Loading and Leveling / Smoothing

  • Benefits of resource loaded schedules
  • Basic resource limitations: Resource capacity and time
  • Resource leveling priorities

Case Study: Resource Loading and Leveling

  • Apply resource leveling principles to model an achievable plan

Schedule Traceability

  • Horizontal vs. Vertical traceability
  • Summary tasks vs. hammocks

Schedule Health

  • Characteristics of a “healthy” schedule
  • Overview of common schedule health metrics

Schedule Review

  • When to perform schedule reviews
  • Types of schedule reviews
  • Stakeholder roles

Class Exercise – Family Vacation (Part 4)

  • Practice schedule review techniques

Schedule Baseline

  • Definition and objectives of the schedule baseline
  • Baseline differences between scheduling tools
  • Baseline revisions

Schedule Status

  • Progress vs. Forecast
  • Status requirements for each activity state
  • Recommendations for effective statusing

Schedule Changes

  • Routine updates vs. Baseline changes
  • Causes of baseline changes

Case Study: Determining Status and Forecasting Project Completion

  • Demonstrate the impact of status on the forecasted project completion

Schedule Acceleration Techniques

  • Overview of common schedule acceleration techniques
  • Demonstrate the “Crashing” technique

Managing Schedule Risk

  • Sources of schedule risk
  • Schedule Risk Assessment (SRA) overview
  • Definition and use of Schedule Margin

Diagnosis and Analysis

  • Overview of “what-if” analysis
  • Cost / Schedule tradeoffs

Case Study: Analyzing Schedule Changes

  • Analyze the status impacts to determine the source of schedule delays

Reporting and Analysis

  • Benefits and limitations of common scheduling formats/reports

Good Practices in Planning & Scheduling

  • Scheduling best practices
  • Schedule review checklist

The Schedule in the Government Environment

  • Differences between commercial and government scheduling
  • Review the documents that define project requirements
  • Introduce the concept of a control account
  • Overview of the Integrated Master Plan (IMP)

Earned Value - Introduction to EVMS

  • Overview of basic EV terms/principles
  • Demonstrate the relationship between the schedule and EVMS
  • Calculation and use of common EV indices

Case Study: Calculation of Cost & Schedule Variances

  • Reinforce understanding of basic cost and schedule indices

Analysis Using EVMS Calculations with the Schedule

  • Use summary EVMS data to identify schedule risk areas
  • Combining EVM indices and schedule data to diagnose issues

Case Study: Schedule Analysis Combining SPI, CPI and Critical Path

  • Use schedule status to calculate indices and forecast project completion

IPMR DID Scheduling Requirements

  • Overview of scheduling requirements in each section of the IPMR DID

Other Government Schedule Metrics

  • Overview of the DCMA 14-pt assessment
  • Review of metrics not already covered in the Schedule Health section

DCMA Data Driven Analytics

  • Overview of the draft metrics DCMA will be using to conduct schedule surveillance reviews

Appendix

Course Evaluation Sheet

Adjourn