Project Scheduling Workshop Agenda

Proudly Serving the EVM Community for 37 Years.
The Leader in Earned Value Management Consulting and Training

EVMS and Project Management Training
Project Scheduling Workshop Agenda

Introduction

  • Discussion of workshop approach
  • Review of notebook contents

Introduction to Project Scheduling

  • What is a schedule?
  • Why is a schedule necessary?
  • What will it take to schedule?

Roles and Responsibilities

  • Roles responsible for Schedule development
  • Scheduler / Planner Skill set

Role of the Schedule

  • Role of the schedule in an integrated business system
  • Government regulations
  • Impact of system deficiencies

The Scheduling Process

  • Nine steps in developing a schedule.
  • Define the objective.
  • Document the environment.
  • Establish the key events to satisfy the objective.
  • Put key events in order of occurrence.
  • Determine the activities required to accomplish the key events.
  • Estimate the duration of each activity.
  • Establish the plan for performing the detailed activities.
  • Load and level resources.
  • Commitment and approval.

Project Scope Definition

  • Define the requirements.
  • Establish a disciplined approach.
  • Define core requirement.
  • Planning the program.
  • Integrated product development framework.
  • Integrated Master Plan (IMP)
  • Integrated Master Schedule (IMS)

Network Diagramming

  • Precedence Diagramming Method (PDM).
  • Activities, events
  • Durations and naming conventions

Relationships and Logic

  • Predecessors
  • Successors
  • Relationship types

Case Study #4: CPM Network Construction

Critical Path Method

  • Definitions and critical path determination.
  • Determining and using total and free float.

Case Study #5: Date, Float and Critical Path Calculations

Lags

  • Calculation Impacts Froward Pass
  • Calculation Impacts Backward Pass

Cast Study #8: Constructing a More Complex PDM Network

Use of Directed Dates

  • No earlier than
  • No later than
  • Imposed Dates
  • Soft Constraints
  • Hard constraints
  • Implications of negative or positive float

Case Study #9: Use of Directed Dates

Other Activity Type Considerations

  • Summary tasks
  • Hammocks
  • Fragnets
  • Level of Effort (LOE)
  • Apportioned Effort

Resource Loading and Leveling

  • Resource loading, profiling, and time/resource constraints.
  • Resource leveling and S-curves.

Case Study #20: Resource Loading and Leveling

Schedule Traceability

  • Definitions, requirements, and methods.

Case Study #11: Schedule Traceability

Case Study #18 Schedule Traceability Activity Codes

Schedule Audit

  • Metrics
  • Requirements
  • Evaluations
  • Practices
  • Sharing the results

Schedule Baseline

  • Definition and purpose of the schedule baseline
  • Baseline development, maintenance, and revision

Schedule Risk Assessment

  • Critical path method (CPM).
  • Risk analysis of the project.
  • Sources of project risk.
  • Process of risk analysis.
  • Limitations of the CPM approach to risk.
  • Probabilistic approach to schedule risk.
  • Monte Carlo approach.
  • Implementing risk assessment.

Schedule Status / Forecast and Estimate to Complete

  • Statusing techniques and results
  • Forecast techniques

Impact of Status/Forecast vs. Schedule Changes

  • Routine updates.
  • Schedule changes.
  • Duration changes.
  • Types of changes.
  • Typical causes of schedule change.

Case Study #12: Determining Status and Forecasting

Case Study #14: Analyzing Schedule Changes

Schedule Health

  • DCMA 14 Metrics

Case Study #19: Analyzing Schedule Changes

Reporting and Analysis

  • Schedule Indices.
  • Schedule Indexes.

Reports

  • Standard reports.
  • Exception reports.
  • Trends and analysis

Introduction to the Earned Value Concept

  • Overview of the Performance Measurement System approach.
  • Earned Value - An essential parameter.

Performance Measurement Calculations

  • Measure performance.
  • Compare performance to plan.
  • Identify significant variances.
  • Analyze significant variances.
  • Evaluate projected schedule and cost performance.

Combining CPM Schedule and Performance Measurement Data

  • Performance Measurement data concern.
  • CPM data review.
  • SPI data review.
  • Combining SPI, CPI, and TCPI data.
  • The problems with getting ahead.

Case Study #15: Control Account Analysis

What-If Analysis

  • Using CPM to investigate alternatives

Schedule Acceleration Techniques

  • Cost/time tradeoffs of project acceleration.

Case Study #13: Crashing the Network

Reporting and Analysis

  • Standard reports.
  • Exception reports.
  • Trends and analysis.

External Schedule Integration

  • Integrating Subcontractor schedules.
  • Integrating Production schedules.
  • Hand-off milestones.

Production Scheduling

  • Typical IMS Architecture
  • Examples of Production schedule types.

System Approach

  • Documentation requirements.
  • Supplemental Guidance.
  • Implementation.

Planning and Scheduling Excellence Guide (PASEG)

  • Schedule Baseline
  • Schedule Execution
  • Schedule Analyses
  • Documentation