Introduction
- Discussion of workshop approach
- Review of notebook contents
Introduction to Project Scheduling Workshop
- Programs vs. Projects
- Workshop Objectives
Use and Users of the Project Schedule
- Impacts of poor scheduling
- Using schedule results
- Schedule Roles and Responsibilities
Schedule Development Process
- Planning vs. Scheduling
- Nine step schedule development process
Scope Definition and Work Breakdown Structure
- WBS overview
- Introduction to the WBS Dictionary
Network Diagramming Fundamentals
-
Introduction to the fundamental components of a schedule network:
- Activities
- Relationships
Case Study: Creating Simple Network Diagrams
- Construction of a basic network diagram
Critical Path Fundamentals
- Definition of critical path
- Forward and Backward Passes
- Total Float vs. Free Float
- How to determine the critical path
- Critical path vs. driving path
Case Study: Forward/Backward Pass Calculations
- Practice the calculation of early dates, late dates, float and the critical path
Project Modeling Techniques
- Use and abuse of Lags
- Schedule Visibility Tasks (SVTs) - an alternative to Lags
- Use and abuse of Leads
- Modeling common processes with Templates
- Overview of integrating Level of Effort into the schedule
Activity Constraints
- Hard vs. Soft constraints
- Constraint types
- Examples of how constraints alter forward/backward pass calculations
Resource Loading and Leveling
- Benefits of resource loaded schedules
- Basic resource limitations: Resource capacity and time
- Resource leveling priorities
Case Study: Resource Leveling
- Apply resource leveling principles to model an achievable plan
Schedule Traceability
- Horizontal vs. Vertical traceability
- Summary tasks vs. hammocks
- Causes of traceability issues
Schedule Health
- Characteristics of a “healthy” schedule
- Overview of common schedule health metrics
Schedule Baseline
- Definition and objectives of the schedule baseline
- Baseline differences between scheduling tools
- Baseline revisions
Schedule Status
- Progress vs. Forecast
- Status requirements for each activity state
- Recommendations for effective statusing
Schedule Changes
- Routine updates vs. Baseline changes
- Causes of baseline changes
Case Study: Determining Status and Forecasting Project Completion
- Demonstrate the impact of status on the forecasted project completion
Reporting and Analysis
- Benefits and limitations of common scheduling formats/reports
Schedule Acceleration Techniques
- Identify the various schedule acceleration techniques
- Understand the potential drawback of each technique
- Participate in a schedule acceleration demonstration
Introduction to Schedule Risk
- Sources of schedule risk
- Schedule Risk Assessment (SRA) overview
The Schedule in the Government Environment
- Differences between commercial and government scheduling
- Review the documents that define project requirements
- Introduce the concept of a control account
- Overview of the Integrated Master Plan (IMP)
Other Schedule Metrics
- Review of metrics not already covered in the Schedule Health section
Good Practices in Planning & Scheduling
- Scheduling best practices
- Schedule review checklist
Appendix
Course Evaluation Sheet
Adjourn